Tasks: Enterprise Appliance Experience Hardening
Input: Design documents from specs/001-enterprise-experience/
Prerequisites: plan.md, spec.md, research.md, data-model.md,
contracts/customer-experience-contract.md, quickstart.md
Tests: Required by the constitution and specification. Contract, journey, accessibility, deployment, recovery, and artifact-evidence tasks are included.
Organization: Tasks are grouped by user story. Phase 1 product delivery consists of Setup, Foundational, and User Story 1; later story phases remain separately acceptable increments.
Format: [ID] [P?] [Story] Description
- [P]: Can proceed in parallel because it targets independent files after prerequisites pass.
- [Story]: Maps directly to the numbered user story in
spec.md. - Every implementation task names its expected repository path.
Phase 1: Setup and Verification Infrastructure
Purpose: Establish safe migration, testing, accessibility, and packaging evidence before product behaviour changes.
- T001 Create the Phase 1 evidence manifest template in
specs/001-enterprise-experience/evidence/phase1-manifest.md - T002 [P] Add Python test configuration and fixtures for isolated appliance data in
tests/conftest.py - T003 [P] Add browser journey and accessibility test configuration in
tests/browser/README.md - T004 [P] Add shell and Ansible validation commands to
tests/deployment/README.md - T005 Document the SQLite schema-version and rollback procedure in
specs/001-enterprise-experience/migrations.md - T006 Record the supported pre-feature appliance baseline and restore fixture requirements in
tests/fixtures/README.md - T007 Verify no product code changes are required to create the test harness and capture the review in
specs/001-enterprise-experience/evidence/phase1-manifest.md
Phase 2: Foundational Customer-Experience Contracts
Purpose: Implement shared contracts that block all customer-journey work.
Critical: No user story implementation begins until these tasks pass review.
- T008 Add idempotent schema-version and migration runner tests in
tests/backend/test_migrations.py - T009 Implement additive SQLite schema-version and migration support in
ansible/roles/cezen-backend/files/main.py - T010 Add customer-state, error-envelope, entitlement-reason, redaction, and allowed/denied-role contract tests in
tests/backend/test_experience_contracts.py - T011 Implement versioned customer-state and error-envelope helpers in
ansible/roles/cezen-backend/files/main.py - T012 Add durable Operation lifecycle, transition, conflict, idempotency, and server-side authorization tests in
tests/backend/test_operations.py - T013 Implement the Operation store and lifecycle rules in
ansible/roles/cezen-backend/files/main.py - T014 Add audit correlation and secret-redaction tests in
tests/backend/test_audit_redaction.py - T015 Extend audit helpers with allowlisted detail and correlation IDs in
ansible/roles/cezen-backend/files/main.py - T016 [P] Create shared accessible state, alert, operation, and confirmation styles in
cezen-portal/style.css - T017 [P] Create shared browser helpers for state rendering, freshness, errors, focus, and announcements in
cezen-portal/experience.js - T018 [P] Add canonical customer-facing product and entitlement vocabulary in
cezen-portal/branding.js - T019 Synchronize canonical license logic into the deployed backend copy and add parity verification in
tests/backend/test_license_parity.py - T020 Verify the foundational contract against
specs/001-enterprise-experience/contracts/customer-experience-contract.mdand record results inspecs/001-enterprise-experience/evidence/phase1-manifest.md
Checkpoint: Durable operations, safe migrations, redacted audit evidence, and shared accessible presentation contracts are independently verified.
Phase 3: User Story 1 — Confident First-Time Setup (Priority: P1) — Phase 1 MVP
Goal: A customer administrator completes or safely resumes setup and reaches a truthful readiness state on both a representative Workstation and Server.
Independent Test: Complete browser and console setup with valid, invalid, interrupted, stale, restricted-network, Workstation, and Server scenarios; refresh or restart during installation and verify the same durable operation, accurate readiness, and safe next action remain available.
Tests for User Story 1
- T021 [P] [US1] Add browser setup validation, duplicate-submit, refresh, interruption, and 2-second acknowledgement timing tests in
tests/browser/test_setup_journey.py - T022 [P] [US1] Add console setup valid, invalid-license, and resume scenario tests in
tests/deployment/test_firstboot_setup.py - T023 [P] [US1] Add readiness state, freshness, entitlement-reason, remediation, and 10-second display timing tests in
tests/backend/test_readiness.py - T024 [P] [US1] Add WCAG 2.2 AA automated and manual-check definitions for setup/readiness in
tests/accessibility/phase1-checklist.md - T025 [P] [US1] Add Workstation-versus-Server setup matrix fixtures in
tests/fixtures/setup-matrix.json
Implementation for User Story 1
- T026 [US1] Persist non-secret browser setup progress and durable installation operation state in
autoinstall/websetup/server.py - T027 [US1] Replace process-local-only progress rendering with resumable operation polling and accessible announcements in
autoinstall/websetup/server.py - T028 [US1] Preserve safe completed steps and expose retry, resume, reboot, recovery, and escalation outcomes in
autoinstall/firstboot-setup.sh - T029 [US1] Align browser and console setup labels, validation, Workstation separation, and Server tier reasons across
autoinstall/websetup/server.pyandautoinstall/firstboot-setup.sh - T030 [US1] Extend readiness aggregation with canonical state, severity, freshness, customer impact, affected capabilities, and next actions in
ansible/roles/cezen-backend/files/main.py - T031 [US1] Update the appliance readiness UI to consume the versioned contract and shared experience helpers in
cezen-portal/appliance.html - T032 [US1] Update the primary landing readiness experience to show truthful current or stale state and highest-value next actions in
cezen-portal/index.html - T033 [US1] Update health rendering to distinguish unreachable, degraded dependency, unavailable capability, and stale observation in
cezen-portal/health.html - T034 [US1] Add local setup, interruption, readiness, and escalation guidance in
cezen-portal/quickstart.htmlandcezen-portal/troubleshooting.html - T035 [US1] Add schema migration, operation recovery, and portal deployment steps to
ansible/roles/cezen-backend/tasks/main.ymlandansible/roles/cezen-nginx/tasks/main.yml - T036 [US1] Verify clean install, interruption, restricted-network guidance, and WCAG evidence on a representative Workstation and record it in
specs/001-enterprise-experience/evidence/workstation-phase1.md - T037 [US1] Verify clean install, interruption, restricted-network guidance, and WCAG evidence on a representative Server and record it in
specs/001-enterprise-experience/evidence/server-phase1.md(software-package clean install and reboot evidence recorded; interruption, restricted-network, ISO boot, and manual WCAG evidence remain) - T038 [US1] Verify source-to-package and source-to-ISO provenance for all Phase 1 surfaces and record checksums in
specs/001-enterprise-experience/evidence/phase1-manifest.md
Checkpoint: User Story 1 and product Phase 1 pass internal evidence review on Workstation and Server and are eligible for controlled pilot, not yet general release.
Phase 4: Delivery Phase 2 — User Story 2: Coherent Daily Administration (Priority: P1)
Goal: Administrators understand current appliance state and complete common daily tasks through a consistent, truthful control-plane experience.
Independent Test: A representative administrator locates and completes the five agreed common tasks within three navigation decisions, with consistent loading, empty, ready, degraded, failed, restricted, unavailable, and stale behaviour.
- T039 [P] [US2] Define five administration journeys, at least 10 representative participants, and acceptance scoring in
tests/browser/daily-administration.md - T040 [P] [US2] Add shared navigation, 1-second feedback timing, status, error, operation, and freshness browser tests in
tests/browser/test_daily_administration.py - T041 [US2] Apply the common navigation and state shell to dashboard and appliance journeys in
cezen-portal/dashboard.htmlandcezen-portal/appliance.html - T042 [US2] Apply the common operation and entitlement contract to model and knowledge journeys in
cezen-portal/models-admin.htmlandcezen-portal/knowledge.html - T043 [US2] Apply role-aware restriction, error, and confirmation behaviour to users and security journeys in
cezen-portal/users.htmlandcezen-portal/security.html - T044 [US2] Expose role-filtered recent and active durable operations in
ansible/roles/cezen-backend/files/main.pyandcezen-portal/appliance.html - T045 [US2] Audit all remaining portal pages for placeholder, fabricated, loading, empty, degraded, dead-control, and legacy-name states and record findings in
specs/001-enterprise-experience/evidence/portal-audit.md - T046 [US2] Resolve accepted portal-audit findings in affected files under
cezen-portal/ - T047 [US2] Validate the five administration journeys and WCAG 2.2 AA evidence and record results in
specs/001-enterprise-experience/evidence/phase2-administration.md
Checkpoint: User Story 2 passes independent task-completion and accessibility acceptance.
Phase 5: Delivery Phase 3 — User Story 3: Safe Operations and Recovery (Priority: P1)
Goal: Operators diagnose, recover, or escalate common failures using safe actions and redacted, correlated evidence.
Independent Test: For each agreed failure, an operator reaches safe recovery or produces a complete redacted escalation package within 15 minutes.
- T048 [P] [US3] Add authorized/denied backup, restore, restart, upgrade, removal, conflict, and interruption tests in
tests/backend/test_recovery_operations.py - T049 [P] [US3] Add support-evidence authorization, allowlist, redaction, and checksum tests in
tests/backend/test_support_evidence.py - T050 [US3] Model backup, restore, and removal as authorized durable operations with preconditions and recovery outcomes in
ansible/roles/cezen-backend/files/main.py - T051 [US3] Add versioned redacted support-evidence generation in
ansible/roles/cezen-backend/files/main.py - T052 [US3] Add safe operation progress, removal inventory, recovery, and diagnostic-export experiences in
cezen-portal/appliance.html - T053 [US3] Align command-line backup/restore evidence and implement backup-preserving removal in
scripts/cezen-backup.shandscripts/cezen-remove.sh - T054 [US3] Add locally available recovery and escalation playbooks in
cezen-portal/troubleshooting.html - T055 [US3] Validate the 20-case failure corpus, backup/restore/removal compatibility, interruption, authorization, and 15-minute escalation outcomes in
specs/001-enterprise-experience/evidence/phase3-recovery.md
Checkpoint: User Story 3 passes independent recovery, redaction, correlation, and support evidence acceptance.
Phase 6: Cross-Cutting Workstream — User Story 4: Predictable Product Entitlements (Priority: P2)
Goal: Workstation and Server customers see capability states that accurately distinguish license, provisioning, hardware, and runtime causes.
Independent Test: The agreed Workstation and Server S/M/L/Max matrix produces consistent labels, permitted actions, restrictions, and help across setup, portal, backend, deployment, and artifacts.
- T056 [P] [US4] Expand valid, missing, expired, mismatch, hardware, and provisioning entitlement fixtures in
tests/fixtures/entitlement-matrix.json - T057 [P] [US4] Add cross-copy and cross-surface entitlement matrix tests in
tests/backend/test_entitlement_matrix.py - T058 [US4] Return distinct licensed, provisioned, hardware-supported, and currently available reasons in
ansible/roles/cezen-backend/files/main.py - T059 [US4] Render commercial labels and reason-specific next actions consistently in
cezen-portal/branding.jsandcezen-portal/appliance.html - T060 [US4] Align installer and deployment role capability decisions in
install.sh,autoinstall/firstboot-setup.sh, andansible/{starter,entry,pro,max}.yml - T061 [US4] Verify documentation and packaged artifacts against the entitlement matrix in
specs/001-enterprise-experience/evidence/entitlement-matrix.md
Checkpoint: User Story 4 passes the full product/tier consistency matrix.
Phase 7: Delivery Phase 2 Workstream — User Story 5: Guided Evaluation and Handover (Priority: P2)
Goal: Evaluators and new administrators understand readiness, licensed capabilities, first tasks, local help, and support evidence within ten minutes.
Independent Test: A representative evaluator completes the agreed discovery script without a live Cezen walkthrough or public internet.
- T062 [P] [US5] Define evaluator and new-administrator discovery scripts in
tests/browser/handover-journey.md - T063 [US5] Add role-aware first-use orientation and persistent local help entry points in
cezen-portal/index.htmlandcezen-portal/quickstart.html - T064 [US5] Align local FAQ and glossary with current product, entitlement, readiness, and recovery terms in
cezen-portal/faq.htmlandcezen-portal/glossary.html - T065 [US5] Add packaged product/build identity and authoritative support references in
cezen-portal/about.html - T066 [US5] Validate the ten-minute restricted-network handover journey and record results in
specs/001-enterprise-experience/evidence/phase4-handover.md
Checkpoint: User Story 5 passes independent evaluation and handover acceptance.
Phase 8: Pilot, Release, and Cross-Cutting Quality
Purpose: Prove the integrated appliance experience before general release.
- T067 Run full static, backend, authorization, timing, browser, accessibility, shell, and Ansible validation and record results in
specs/001-enterprise-experience/evidence/release-candidate.md - T068 Verify upgrade, rollback, backup/restore, and interruption from the supported prior appliance baseline in
specs/001-enterprise-experience/evidence/release-candidate.md - T069 Verify final source revision, packaged copies, ISO identity, build time, size, and SHA-256 checksums in
specs/001-enterprise-experience/evidence/release-candidate.md - T070 Conduct the approved controlled customer pilot and record non-sensitive findings in
specs/001-enterprise-experience/evidence/pilot.md - T071 Resolve and revalidate all critical customer-safety, task-completion, entitlement, recovery, and WCAG findings in
specs/001-enterprise-experience/evidence/pilot.md - T072 Obtain product-owner and delivery/support approval in
specs/001-enterprise-experience/evidence/release-approval.md - T073 Review the complete Git diff and explicitly authorize or defer commit, push, deployment, ISO rebuild, and general release in
specs/001-enterprise-experience/evidence/release-approval.md
Dependencies and Execution Order
Phase Dependencies
- Setup (T001–T007) has no product-code dependency.
- Foundational contracts (T008–T020) depend on Setup and block every user story.
- User Story 1 (T021–T038) depends on Foundational and is the Phase 1 MVP.
- User Story 2 (T039–T047) depends on Foundational; its operation-history work depends on User Story 1.
- User Story 3 (T048–T055) depends on Foundational and durable Operation support from User Story 1.
- User Story 4 (T056–T061) depends on Foundational and can proceed after Phase 1 entitlement contracts stabilize.
- User Story 5 (T062–T066) depends on accepted terminology and readiness behaviour from Stories 1 and 4.
- User Story 4 is cross-cutting across Delivery Phases 1–3; User Story 5 is accepted within Delivery Phase 2. Neither creates an additional delivery phase.
- Pilot/release (T067–T073) depends on the stories included in that release candidate.
User Story Dependency Graph
Setup -> Foundation -> US1 Setup/Readiness (Phase 1 MVP)
|-> US2 Daily Administration
|-> US3 Recovery/Support
|-> US4 Entitlement Matrix -> US5 Handover
Selected accepted stories -> Pilot -> Joint Approval -> General Release Eligibility
Parallel Opportunities
- T002–T004 can run in parallel after T001.
- T016–T019 can run in parallel after backend contract shapes stabilize.
- T021–T025 can be authored in parallel before US1 implementation.
- T036 and T037 can run in parallel on separate representative appliances after T026–T035.
- Story-specific test authoring for US2, US3, and US4 can proceed in parallel after Foundation.
Implementation Strategy
Phase 1 MVP First
- Complete T001–T020.
- Complete T021–T035 test-first for User Story 1.
- Validate Workstation and Server independently with T036–T038.
- Stop for internal evidence review and controlled-pilot authorization.
- Do not begin general release or later product phases automatically.
Incremental Delivery
Each user story retains its own independent test and evidence checkpoint. Later story phases reuse the same state, operation, entitlement, accessibility, audit, and release contracts without changing their meaning.
Notes
- Every task that changes behaviour is preceded by an applicable test or evidence definition.
- Application files remain unchanged until
$speckit-implementis explicitly authorized. - Existing untracked
how-it-flows.gifis unrelated and MUST remain untouched. - Commit, push, deployment, ISO rebuild, pilot, and general release require explicit authorization at their respective gates.